Engagement Intake · Pre-analysis
This form collects the minimum evidence required to instantiate a Directed Weighted Failure Graph and calibrate the loss distribution: contact, engagement scope, architecture description, and the last 6–12 months of material incidents. All fields are validated locally; nothing is sent until submission.